Template · flipping

Rehab Budget Template

A line-item rehab budget format covering all standard trades. Designed for both flip-grade (retail buyer expectations) and BRRRR-grade (durable tenant finishes) scope. Use as the basis for contractor bidding — same template, multiple contractor inputs, side-by-side comparison.

What you get
  • Standard trade categories (demo, structural, mechanicals, finishes)
  • Quantity / per-unit cost / total columns for each line
  • Contingency calculation (15-20% of subtotal)
  • Comparison column for 2-3 contractor bids
  • Notes section for scope clarifications
How to use it
  1. Walk the property with a checklist before talking to contractors. Note every issue.
  2. Send the same blank template to 3 contractors with a written scope description
  3. Receive 3 bids back in the same format — apples-to-apples comparison
  4. Lock the scope BEFORE signing. Change orders are how rehabs blow up the budget.
Advertisement
Ad slot: template_mid
The template

Copy below, or download.

REHAB BUDGET — PROPERTY: ________________

Scope target: [ FLIP RETAIL / BRRRR TENANT / OWNER-OCCUPY ]
Square footage: __________  ·  Bedrooms: __  ·  Bathrooms: __

============================
DEMO & PREP                              QTY    UNIT    TOTAL
============================
Trash-out / debris removal:              ___    $______   $______
Tear-out (kitchen / baths):              ___    $______   $______
Floor demo:                              ___    $______   $______
Disposal fees / dumpster:                ___    $______   $______
                                            DEMO SUBTOTAL: $______

============================
STRUCTURAL & EXTERIOR                    QTY    UNIT    TOTAL
============================
Roof repair / replacement:               ___    $______   $______
Siding repair:                           ___    $______   $______
Foundation work:                         ___    $______   $______
Windows (each):                          ___    $______   $______
Exterior doors (each):                   ___    $______   $______
Exterior paint:                          ___    $______   $______
Gutters:                                 ___    $______   $______
Driveway / walkway:                      ___    $______   $______
                                       STRUCT/EXT SUBTOTAL: $______

============================
MECHANICALS (HVAC / PLUMBING / ELECTRIC) QTY    UNIT    TOTAL
============================
HVAC repair / replace:                   ___    $______   $______
Water heater:                            ___    $______   $______
Plumbing rough + finish:                 ___    $______   $______
Electrical rough + finish:               ___    $______   $______
Service panel upgrade:                   ___    $______   $______
                                          MECH SUBTOTAL: $______

============================
INTERIOR FINISHES                        QTY    UNIT    TOTAL
============================
Drywall repair / texture:                ___    $______   $______
Interior paint (per sqft):               ___    $______   $______
Trim / doors:                            ___    $______   $______
Flooring (per sqft):                     ___    $______   $______
                                       INTERIOR SUBTOTAL: $______

============================
KITCHEN                                  QTY    UNIT    TOTAL
============================
Cabinets:                                ___    $______   $______
Countertops:                             ___    $______   $______
Appliances:                              ___    $______   $______
Sink + faucet:                           ___    $______   $______
Backsplash + tile:                       ___    $______   $______
                                       KITCHEN SUBTOTAL: $______

============================
BATHROOMS                                QTY    UNIT    TOTAL
============================
Vanity:                                  ___    $______   $______
Toilet:                                  ___    $______   $______
Tub / shower surround:                   ___    $______   $______
Tile floor:                              ___    $______   $______
Fixtures (faucets / lighting):           ___    $______   $______
                                       BATHS SUBTOTAL: $______

============================
LANDSCAPING & FINAL                      QTY    UNIT    TOTAL
============================
Landscaping / grading:                   ___    $______   $______
Fencing:                                 ___    $______   $______
Final clean:                             ___    $______   $______
Punch list buffer:                       ___    $______   $______
                                       FINAL SUBTOTAL: $______

============================
PERMITS & FEES                                              TOTAL
============================
Building permit:                                            $______
Electrical permit:                                          $______
Plumbing permit:                                            $______
Inspection fees:                                            $______
                                       PERMITS SUBTOTAL:  $______

============================
TOTALS
============================
Subtotal (all categories):                                  $______
Contingency (15-20%):                                       $______
GRAND TOTAL:                                                $______

Per-sqft cost:                                              $______/sqft
[ Benchmark: cosmetic-only $25-35; mid-grade $40-55; gut $60-90 ]

============================
CONTRACTOR BID COMPARISON
============================
                    Bid 1: ______      Bid 2: ______      Bid 3: ______
Total bid:          $______           $______           $______
Timeline:           ____ weeks        ____ weeks        ____ weeks
Reference checks:   [ y/n ]           [ y/n ]           [ y/n ]
Insured / bonded:   [ y/n ]           [ y/n ]           [ y/n ]

Selected contractor: ____________________________
Reason: ______________________________________________________
Watch out
  • Cheapest contractor is rarely the best contractor. Reference checks and recent project tours matter more than the bid number.
  • Always include 15-20% contingency. Rehabs run over budget; the contingency is the difference between a profitable project and a loss.
  • Lock scope before signing. Mid-project change orders compound — both in cost and in trust erosion with the contractor.
More templates

REI utility library.

wholesaling
Assignment contract

A starting-point assignment of contract for transferring your purchase rights to an end buyer. Three-party agreement between the wholesaler (assignor), end buyer (assignee), and reference to the original seller in the underlying contract.

brrrr rentals
BRRRR analysis sheet

A one-page deal-analysis structure for BRRRR underwriting. Plug in the inputs, compute the five numbers a BRRRR has to clear: all-in cost ≤ 75% ARV, refi appraisal supported, refi proceeds ≥ all-in, monthly cash flow ≥ $200/door, DSCR ≥ 1.20.

sourcing
Direct mail letter

A starting-point yellow-letter style template for direct-mail outreach to absentee owners, free-and-clear owners, or pre-foreclosure lists. Designed to feel personal and low-pressure — high-pressure mailers produce angry responses and policy complaints, not deals.

wholesaling
Buyers list

A structured format for building and maintaining a vetted cash buyers list. The wholesaler's most valuable asset — segmented properly, this list determines how fast you can move deals.

creative finance
Subject-to disclosure

A starting-point disclosure document for subject-to transactions, where the seller signs an explicit acknowledgment that they understand the structure, the risks, and their continued exposure on the underlying mortgage. Critical for legal protection and good ethics.

wholesaling
Inspection addendum

A standard addendum to a purchase agreement granting the buyer (typically the wholesaler) a defined inspection period during which the contract can be canceled and earnest money returned. The wholesaler's primary risk-management tool.

sourcing
D4D route planner

A systematic structure for planning and tracking driving-for-dollars routes. The discipline isn't in the driving — it's in the consistent route coverage, signal logging, and follow-up that converts photos into contracts.

The newsletter

The Weekly Deal Memo

One market memo, one off-market playbook, one tool review. Every Friday. Free.

No spam. Unsubscribe anytime.